Skip to content
Project Name : FGR Compressor Package PU6
End User : Shell Eastern Petroleum (Pte) Ltd  Pulau Bukom
Main Con : Applied Engineering Pte Ltd
Scope of Work : Fabrication, installation and testing of Skid and piping
Quantity :8 skids 
Structure  :94 Tons, Piping : 4990 Dia Inch
Material  : Structure – Carbon Steel (S355 J0 ) Piping  – Carbon Steel and Stainless Steel (SS316)

Back To Top