Project Name CPP BANGLADESH SPM DOUBLE PIPELINE PROJECT
End User SENSIA UK LIMITED (EASTERN REFINERY LIMITED (ERL)
Main Con Applied Engineering Pte Ltd
Scope of Work Fabrication, installation and testing of Skid and piping
Quantity Prover Skid – 2 Units, Metering Skid – 2 Units
Structure  37 Tons, Piping : 4350 Dia-Inch
Material  Structure – Carbon Steel S355 J0 Piping  – Carbon Steel (API 5L Gr 52)


Project Name : HEAT EXCHANGER
End User P.T. ASAHIMAS
Main Con Applied Engineering Pte Ltd
Scope of Work Fabrication of Shell and Tube bundle
Quantity Shell and tube bundle – 1 Unit
Material  Shell – Carbon Steel ID2400 x 40mmT x   17940 mm Lg
Tube bundle –   Stainless Steel  tube  Dia 8” x   24mmT 

Project Name HEAT EXCHANGER
End User Singapore Refining Company
Main Con Applied Engineering Pte Ltd
Scope of Work Retubing of tube bundle
Quantity Tube bundle – 1 Unit ( OD )
Material  Tube – Carbon Steel  Dia 1” x 2.77mm T

Project NameBUZIOS FIELD AREA DEVELOPMENT (P79)
End UserPETROBRAS
Main ConApplied Engineering Pte Ltd
Scope of WorkFabrication of WAG Injection Well Pig Receiver  
Quantity10 Units
MaterialSuper Duplex Stainless Steel (A790 UNS S32750 U A182-F53)

Project NameVacuum Pump Skid Package 50KTA
End UserShell Eastern Petroleum (Pte) Ltd
Main ConApplied Engineering Pte Ltd
Scope of WorkFabrication, installation and testing of Skid      and piping 
Quantity1 skid
MaterialStructure – Carbon Stee (S355 J0 )
Piping  – Carbon Steel