Project Name | Changi water reclamation plant phase 2 (C22C) |
End User | PUB Singapore National water Agency |
Main Con | MEMIONTEC PTE LTD |
Scope of Work | Fabrication and installation of stainless Steel piping and supports |
Quantity | Piping Dia Inch 30,000 & Support : 50,000 k |
Material | Piping – Stainless Steel (SS316) Support – Carbon steel + HDG |
Project Name | Deep Tunnel Sewerage System Project |
End User | PUB Singapore National water Agency |
Main Con | MEMIONTEC PTE LTD |
Scope of Work | Fabrication and installation of FRP ducting and supports |
Quantity | 13 Shafts |
Material | Piping – FRP Support – Stainless Steel (SS316) |
Project Name : | Waste Water Treatment Plant (ASE SINGAPORE PTE.LTD.) |
End User : | Hitachi Aqua-Tech Engineering Pte. Ltd. |
Main Con : | Mencast Offshore & Marine Pte. Ltd. |
Scope of Work : | Fabrication and installation of Piping and equipment & Instruments |
Quantity : | 1 Lot |
Material : | Piping – PVC Support – GI Carbon Steel |
Project Name : | Wastewater Treatment Plant & Wastewater recovery Plant |
End User : | F&N FOODS PTE. LTD. |
Main Con : | MEMIONTEC PTE. LTD. |
Scope of Work : | Fabrication and installation of Piping and equipment & Instruments |
Quantity : | 1 Lot |
Material : | Piping – Stainless Steel, PVC Support – GI Carbon Steel |
Project Name | STM- ITALY PROJECT |
End User | VEOLIA WATER TECHNOLOGIES(SEA)PTE LTD |
Main Con | VEOLIA WATER TECHNOLOGIES(SEA)PTE LTD |
Scope of Work | Design and Fabrication Mixed Bed Vessel & Skid package |
Quantity | MB Vessel – 4 Units and base skid – 9 units |
Material | MB Vessel -CS + Internal halar coating & SS Vessel Structure Base Skid – carbon steel |